KALPVISHWA- THE STRUCTURE TAKES SHAPE
On the eighth floor at Kalpvishwa, the primary deck beam framework is complete and metal decking is now being laid — the floor system is advancing toward reinforcement placement and concrete casting.
The installation of the primary deck beam framework has been completed across the designated slab area. This establishes the structural support required for the floor system, providing a stable and accurately aligned framework for the subsequent stages of slab construction. With the primary members in place, the project has achieved a significant step in the development of the eighth-floor structural works.

The deck beam grid has been fully secured and aligned in accordance with the structural layout. The framework is now prepared for the installation of the metal decking, ensuring that the supporting system is in place to receive the slab assembly. The completion of this interconnected grid reflects steady progress in the structural construction sequence and enables the project to advance to the next phase of floor construction.

Installation of the metal decking sheets is in progress over the completed beam framework. The slab assembly is advancing towards reinforcement placement and concrete casting, with the decking providing a continuous working platform and permanent formwork for the floor slab. This stage represents a key milestone in the construction process, bringing the floor system closer to structural completion.

On site — securing connections and positioning members across the deck beam framework.



Beam placement, welding, and bolted connections through the framework stage.